 **New Project:** Design and Engineering of Nijega well hook upIMG_0990
Client: Elixir
Period:2 months
Description: Vermilion B.v would like to produce natural gas from his old location in Nijega.  In this project, the existing well NGA009 must be again connected to the existing pipelines.
Pipelines are pre-fabricated and installed at site now.
Software: AutoCad 2-D
Activities: Preparing Plot Plan, Piping design,Stress analysis, Piping general arrangement,Isometrics, Pipe support drawings, Demolishing drawings Material engineering.
**New Project:** Development of Nieuwehorne well site
Client: Elixir
Period: 4 months
Description: Vermilion B.v would like to produce natural gas from his new location in Nieuwehorne. There are two sellers which be drilled and placed in April 2016. All Piping activities from concept Design till Detail Design and Engineering must be done  before this time.
Software: PDMS 3D
Activities: Preparing Concept Plot Plan, Piping design, Material engineering and procurement, Stress analysis and Supporting.
 Old projects:
  1. PDMS administration Tebodin-Groningen :
  2. Duration : 4 months

  Description:

  • Creation of Project, setting up of users & environment.
  • Handling various application of PDMS system.
  • Maintaining design macros for review exports, Naviswork .
  • Preparing animation sequence, walk through for Review Reality.
  • Maintaining clash reports through clash manager.
  • Preparing and updating catalogue components and piping specifications, directly by PDMS applications.(maintaining PDMS catalogue according to latest vendor data).
  • Preparing reports, MTO, etc.
  • Ensuring Proper Input Output to & from PDMS. (Setup for isometric project specific option files and backing sheets).
  • Trouble shooting & helping users for proper PDMS output.

–  Status        :Finished

2. Piping and plant design ( Basic Engineering N2 Compressor-FLNG module SBM Schiedam)

Duration : 3 months

  Description:

SBM Offshore is developing a market portfolio for floating LNG facilities for offshore and near shore applications. The project objective is to set-up an FLNG portfolio that covers a wide range of products for the midscale FLNG market between 1.6 and 2.7 MTPA. The selected basis of design covers worldwide FLNG prospects.The project shall be arranged in two phases; respectively phase 1 “Concept Selection” and phase 2 “Concept Definition”.The main objective at the end of phase 2 is to develop a strong basic design package to be used to set-up partnerships with Technology Providers and Shipyards for the SBM midscale FLNG portfolio.The objective of this study is to get a better understanding of the expected weights for a N2 Compression module.In addition this study is used to identify lay-out issues & pipe stress critical items.The expected maturity of the model is 30%.

Status:  Finished